get a quote

UK industrial site with smart meter
Meter installation

Free meter installs. Smart by default.

Smart, half-hourly or standard, we install, configure and certify business meters across the UK at no cost when you switch your supply with us.

Most requested

Smart meter (SMETS2)

Half-hourly readings, automatic billing, no manual reads.

  • Free install & commissioning
  • Half-hourly granularity
  • Works with all major UK suppliers
  • 4–6 week typical lead time
Meter types

Every business meter type, installed by certified UK engineers.

Smart meter (SMETS2)
SmartMost requested

Smart meter (SMETS2)

Half-hourly readings sent automatically to your supplier. End of estimated billing.

  • SMETS2 certified
  • WAN-connected
  • In-Home Display included
Half-hourly (HH) meter
Half-hourly

Half-hourly (HH) meter

Mandatory for sites with 100+ kVA maximum demand. Detailed settlement data.

  • Profile class 5–8
  • Data collector & aggregator
  • Full HH data feed
Standard credit meter
Standard

Standard credit meter

Single or two-rate analogue meters for smaller business sites with stable demand.

  • Profile class 1–4
  • Quarterly meter reads
  • MPAN / MPRN registered
How it works

From request to certified install in 4–6 weeks.

Step 01

Tell us about your site

Postcode, business name and current supply, we identify your MPAN/MPRN automatically.

Step 02

We confirm meter type

Our engineers confirm which meter suits your load profile and arrange supplier sign-off.

Step 03

Engineer site visit

MOCOPA-accredited engineer installs the meter and commissions the WAN connection.

Step 04

Certified & live

Meter goes live, settlement registered, first half-hourly reads flow to your supplier.

Why install with us

MOCOPA-accredited. Free at the point of switch.

Our metering team is MOCOPA-accredited for HH and smart installations across England, Scotland and Wales. We co-ordinate with your DNO, MOP and supplier so you don't have to.

Book a site survey →

£0

Install cost when you switch supply with us

4–6 wks

Typical end-to-end lead time

MOCOPA

Accredited for HH and smart installs

UK-wide

Engineers across England, Scotland & Wales

Help & FAQ

Meter installation questions, answered

Quick answers to the questions UK business owners ask us most.

Do I have to pay for a new meter?+

No. When you switch your supply through Scottish Prime Energy, the meter install is free, covered by your supplier as part of the contract.

Will my supply be interrupted during install?+

There's typically a 20–40 minute supply interruption while the engineer fits the new meter. We schedule it around your trading hours.

Can I keep my existing supplier and just upgrade my meter?+

Possible in some cases, your existing supplier may need to authorise the install. Our team can co-ordinate this for you.

What's the difference between SMETS2 and HH metering?+

SMETS2 is the UK's second-generation smart meter standard for smaller sites. HH (half-hourly) is mandatory for sites with 100+ kVA peak demand.

Free with every switch

Upgrade your meter for free.

Smart, half-hourly or standard, MOCOPA-accredited engineers install at no cost when you switch your supply with us.

Trustpilot 4.8 / 5 · Free to use · 30-second switch

Compare energy prices